How long should a solo MVP take to build?

Cal Renshaw, , 2 minute read

7 days. If the smallest version somebody would pay for takes longer than a week for one person, the idea is too big to test, and you should cut it down before you start rather than after.

Where the 7 days comes from

I spent 14 years as a contract developer. What I learned, without noticing, was how long a build actually takes as against how long anyone says it will. That number never left me, and it's why every deadline in my books is 7 days rather than a month.

A month gives a project room to grow features nobody asked for. A week forces the question: what's the one thing it must do?

What fits in a week

The product I spend my Sunday evenings on was built in 7 days, after asking for the money first. Day 1 went on the checkout and the payment account, because paperwork is the part that can't be rushed. The core of the product took 2 days. The machinery that runs it took half a day, because I'd built it once before for a product that died. Day 5 was the check that stops it sending out wrong answers.

Nothing heroic: that's what happens when the stack is dull, the scope is one job, and the slow parts go first.

What doesn't fit, and what that tells you

My first product took 6 weeks, mostly spent learning a framework I'd wanted to try. A tool for tracking which client had signed off which version of a design took 9 days, and nobody had paid by week 3.

When a build runs long, it's usually saying one of 2 things: you're building more than one job, or you're learning on the customer's time. Both are fixable before you start.

The week, in order

  1. Day 1: the payment account and the checkout. Not last. First.
  2. Days 2 to 4: the one job the product does.
  3. Day 5: the check that catches it when it's wrong.
  4. Days 6 and 7: the page that explains it, and the first message to the people who paid.

Ship Alone sets out the week in full, with the dull stack that makes it possible.

Questions

Can you really build a SaaS in a week?
A small one that does one job, yes, on a stack you already know. If it can't be done in a week, cut the scope until it can.
What should an MVP include?
The one job someone paid for, a way to take their money, and a check that stops it doing the job wrong. Nothing else.
Why do MVPs take longer than planned?
Usually because they're doing more than one job, or because the builder is learning a new tool at the same time. Fix both before day 1.